What is the going rate for doing concrete drive ways per sq. ft.
Have one that is 14k not sure how to bid it figure 28-30 hrs.
using a 3k psi and a turbo nozzle
Have one that is 14k not sure how to bid it figure 28-30 hrs.
using a 3k psi and a turbo nozzle